The surveyor's role during execution
Our role doesn't end at plan delivery; during works we step in at key milestones:
- Stake-out: transferring the design to the ground precisely.
- Level control: verifying cut/fill levels against the design.
- Quantity surveys: measuring executed works for payment statements.
- As-built plan: documenting what was actually built.
The result
A project true to its plans, fewer disputes, controlled costs.